Agree a packing list with stable panel or pack IDs and a receiving plan that follows the selected product's handling instructions. Record quantity and condition separately. A signed carton count alone does not document concealed damage, dimensional conformity or completion of installation.

What to confirm before proceeding
RecordWhat to make explicit
Pack-to-room mappingLink each pack to the panel model, finish, quantity and destination room or elevation. Keep any cut-panel IDs aligned with the drawing so a mixed delivery can be sorted without relying only on colour.
Protection to confirmAsk the supplier to document face separation, edge and corner protection, pack support and labels for the proposed product. Record agreed packing photos before dispatch; do not invent a universal packing method for every panel material.
Receiving conditionsObtain pack dimensions and weights, then have the receiving team plan access and handling resources. Confirm a storage location and product-specific storage instructions before delivery; unfinished site conditions should remain an open issue.
Count and conditionRecord the delivery date, pack ID and count. Photograph outer-pack damage before opening, then check accessible faces and edges against the agreed inspection plan. Keep observed damage and items not yet checked in separate fields.
Exceptions and retained referencesMap each shortage or damage report to its panel and location, with photos and the action owner. Retain the relevant sample, packing list and document revision for review; isolate questionable items from the ready-to-install list.

Take this into your next conversation.

  • Pack labels can be traced back to the panel schedule.
  • Access, handling and storage have been reviewed by the receiving team.
  • Damage, shortages and unchecked items have different statuses.
  • Receipt records do not claim installation or final acceptance.